March 10, 2021
The railway system has a casualty figure touching
With the establishment of flourishing textile mills, affluent and enterprising
people began to settle down in the city, who were naturally jewellery buyers.
Curiously, the recent stampede happened on the Elphinstone Road side of the FOB
connecting Parel and Elphinstone Road stations, while Elphinstone Road has two
accesses to two FOBs and two to the ROB. Just as suburban rail services were
extended up to Borivali, then Virar and now Dahanu on the WR; and Thane, Kalyan,
then Karjat and Kasara, and now Khopoli on the CR mainline, the Harbour line has
expanded across the Thane Creek, reaching Thane in the north and Panvel towards
the south in the Mumbai Metropolitan Region (MMR).The city also began to take
shape according to the needs of its burgeoning population.
The stairway where
the stampede took place is located at the western end of the only connector FOB
leading to the exit point on the road directed towards the north.(Sudhir Badami
is a transportation analyst). This apathy was so great that even after offices
replaced mills and the stations started seeing a manifold rise in footfalls,
their facilities remained almost unchanged.The Mumbai Suburban Rail Network is
operated by two Divisional Railways — the Western Railway (WR) and the Central
Railway (CR), formerly known as the Bombay, Baroda and Central India Railway
(BB&CI) and the Grand Indian Peninsular (GIP) Railway.With our commitments
to contain global warming and climate change, travelling rapidly on the ground
is definitely better than travelling by air.These chawls, generally located in
close proximity to mills, were situated in Dadar, Parel, Chinchpokli, Byculla
and Mahalaxmi, and workers generally walked to their respective mills, while
using the railway or trams to commute farther distances.In this context, one has
to view the stampede of September 29.
However, so long as such mega projects
keep getting implemented, the upgradation of existing infrastructure is likely
to be overlooked. Today, platforms are nearly 300-m long and many of these
stations have access to one foot overbridge (FOB). All China mechanical stretch fabric
Suppliers these stations, which were catering to six coach trains, were
increased to accommodate 12-coach rakes over time and there has hardly been
investment in facilities matching the growth, other than lengthening the
platforms. The long-term measures are essentially to reduce usage of the
suburban railway system to design capacity so as to totally eliminate the
current annual casualty figures. Therefore, it is ill advised to proceed with
priority when the state of current infrastructure has such a dismal safety
record. However, employability in MCGM is still very strong and hence commuting
is also considerable. The mill areas have probably grown merely 20 per cent of
their potential.In this context, owing to the fact that the bullet train will
connect Mumbai and Ahmedabad in two to three hours, we can look forward to a
rise in economic activity. Historically, the BB&CI and GIP were set up to
transport exportable produce to Bombay Harbour and cotton to textile mills.The
plan to get a bullet train from Japan should be dropped entirely and deferred
until we establish our own technologies. The workforce of the textile mills,
which came from interior Maharashtra and the Konkan, resided in housing
tenements called chawls. For example, providing two additional FOBs on Parel
station.Over the years, stations were added on the lines, and a diversionary
line serving the dock areas known as the Harbour Line was established.Certain
short-term measures, if taken on a war footing, can prevent such tragedies.
Naturally, the commuter density on these two stairways must have been so high
that one person slipping could prove disastrous. Thus, due to railways and the
state government’s prolonged neglect, commuting facilities have been inadequate
and thereby unsafe.The second stairway at the same end is directed towards
south. Long-term measures are also to augment facilities for commuters to reach
platforms. Mumbai-Ahmedabad is the first phase of the Delhi-Mumbai Industrial
Corridor. The apathy of the "ruling class" towards the workforce and the
latter’s tendency to walk to work resulted in Mahalaxmi, Lower Parel,
Elphinstone Road, Chinchpokli, Parel stations not developing proportionally to
the increase in their usage and the population.
The railway system has a
casualty figure touching 3,500 per annum. It will definitely help increase
employability of Indians. The diamond and jewellery industry established in
Surat and Vadodara expanded, as did textile mills, which were already in place
at Ahmedabad. There are situations when north-bound and south-bound trains on
the CR and WR discharge people at Parel and Elphinstone Road almost
simultaneously. The city’s growth began to mirror that of its textile industry.
Such a dense commuter flow may not be there at all the suburban stations, but "a
tragedy waiting to happen" exists at practically every railway station during
the three-and-a-half-hour peak period every day. Though the population in the
MCGM has attained low growth rate, the MMR is rapidly increasing
population-wise. The MMR has an area nearly ten times that of the Municipal
Corporation of Greater Mumbai (MCGM). The situation at Parel station in
particular has been referred to as a "tragedy waiting to happen" in many
reminders by the people to the powers that be
Posted by: stretch,functional fabrics Suppliers at
02:08 AM
| No Comments
| Add Comment
Post contains 864 words, total size 6 kb.
14kb generated in CPU 0.0746, elapsed 0.1347 seconds.
33 queries taking 0.0832 seconds, 46 records returned.
Powered by Minx 1.1.6c-pink.
33 queries taking 0.0832 seconds, 46 records returned.
Powered by Minx 1.1.6c-pink.